Tel:+86-516-66671368 / Fax:+86-516-82631786

Idioma : español

HX26D/36D Guardrail Pile Driver

HX26D/36D Guardrail Pile Driver

Xuzhou Hengxing Jinqiao Machinery Technology Co., Ltd.
Tel: 0086-516-66671368/Fax:0086-516-82631786
Mob.: +8615252103728(Whatsapp&Viber)
Skype: hxjinqiao
Email: admin@hxjinqiao.com/kylin@hxjinqiao.com
Web: http://everstarcm.com/ /http://hxjinqiao.en.alibaba.com
Add:Third Industrial Park, Tongshan Economic Development Zone, Xuzhou City, Jiangsu Province,China.(221116)
Facebook: https://www.facebook.com/everstarcm/
Linkedin: https://www.linkedin.com/company-beta/6400073/
Twitter: https://twitter.com/everstarcm
Google+: https://plus.google.com/+XuKylin




PRODUCT INTRODUCTION

  1. Product features

    HX26D/36D Guardrail Pile Driver

    .jpg_01.jpg



    TECHNICAL PARAMETERS
    NO Item Value Unit
    1 Dimension(L*W*H) 2600*2280(Folded 2650)*2600(Working3900) mm
    2 Chassis width 1600 mm
    4 Hdraulic hammer size YC260/YC360  
    5 Hdraulic hammer working flow rate 50-90 l/min
    6 Hdraulic hammer working pressure 11-14/12-15 Mpa
    7 Impact frequency 400-800 bpm
    8 Hdraulic hammer working route 700-2600 mm
    9 Rod diameter 75/85 mm
    10 Hdraulic hammer impact power 6-8/7-14 T
    11 piling efficency 2000/2500 mm/min
    12 Engie power 33/36.8 KW
    13 diesel engine speed (max) 2500 r/min
    14 Weight of diesel engine  270 kg
    15 Walking motor torque(max) 1950 Nm
    16 Rotary motor torque(impact drill) 800-1800 Nm
    17 Mast route 2000 mm
    18 Drilling depth 1700 mm
    19 Drilling diameter 68-300 mm
    20 Angle of sliding rail rack left30/right10 °
    21 Angular adjustment of frame(forwards/backwards) ±10 °
    22 Hydraulic system pressure 16-20 Mpa
    23 Hydraulic system flow 63-80 ml/r
    24 Gear pump 540-550 ml/r
    25 Traveling speed 10000-15000 m/h
    26 sliding route(left/right) 0—450 mm
    27 Grade ability 30 °
    28 Hydraulic tank(L*W*H) 600*360*400 mm
    29 Model HX26D-1,-2,-3,-4,-5   HX36D-1,-2,-3,-4,-5  


    1.What is the main function of our pile driver?
     
     Ans.: It has different models used for all kinds of PV post and Highway guardrail install, it is the best choice for solar power station construction.
     

     
     2.What is the warranty of our machine?
     
     Ans.:Our main machine enjoys a 6 months warranty(except for the hammer),during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.
     
     

    3.What is the lead time and shipping method?
     
    Ans.:Usually the lead time is 3 days, and we send the machine by sea.
     
     
     
    4.What kinds of payment terms do we accept?
     
    Ans.:T/T or L/C at sight...



    _03.jpg_04HXd.jpg_06.jpg_08.jpg_09.jpg

  2. HX26D/36D Guardrail Pile Driver

    Hydraulic Hammer Ramming Steps

    20kw, 23kw horsepower diesel engine is used as drive force, and hydraulic hammer as impactor.

    1. Working temperature:

    Environment temperature-25℃~40℃. Add about 100 Kg “Great Wall” hydraulic pressure oil.

    Working temperature of hydraulic oil: 30 ℃ ~65 ℃ , N68# used in summer, and N46# in winter.

    2. Main points for operation and special notices:

    The operator adjusts the lifting guide rail vertical to ground, install and tighten the guide rail fixing bolt, add butter on surface of guide rail as lubrication. Forbid working in the case without butter.

    ‚ Before operation, check each system until they are identified as normal, and the engine should run for 3-5 minutes with no load.

    ƒ Before or after daily work, strictly check whether any joining screw is getting loosened. If any screw is getting loosened, immediately tighten it.

    ④When driving outside 500 mm side pile, about 200 kg applied weight shall be added at rear part.

    ⑤Vertical degree of pile must be kept when driving pile so as not to affect life of borer pole.

    3. When machine is switched off, track should be laid upward.

    4. Before switching off the machine, guide rail beam must be taken back, and hydraulic hammer must also be laid down on ground.

    5. The safety valve in multi-way valve has been adjusted in factory, you do not need to adjust it during construction.

    You should operate according to the instruction marks on panel, and do not allow large amplitude operation.

    For more information please refer to our video on Youtube

     


  3. Maintenance and Care of the Machine

    1. Daily check and care of machine

    a. After or before operation every day, all joint points of screws must be checked, see whether they are getting loosed, especially the screws on joints points of main machine and operation device. If there are loosed screws, immediately tighten them.

    b. Observe interface of hydraulic elements with eyes to check if there are any leakages at the pipe joints of all oil circuits.

    c. Before each work shift, machine should run several minutes (a litter longer in winter) with low speed, and operate handles with hand for warming up.

    d. Infuse lubrication to each lubricating point once before operation of each shift.

    2. Use and maintenance during running-in period

    a. Running-in period refers to 100-hour operation period since hydraulic pile is started. During the running-in period, machine must not be over-loaded. And the life of the machine largely depends on running-in period.

    b. Cleanness of hydraulic pressure oil should be checked 50 hours after the machine begins operation, and the grade of cleanness must not be less than 18/15; at the same time, check and clean intake and return oil filters, and they should be cleaned or replaced every 200 hours later; during the check. It should be noticed whether rubber or asbestos gasket is damaged, and the damaged ones should be replaced in time.

    3. Level of hydraulic oil should be checked every 50 hours to ensure the height of oil level.

    4. Clean oil box. When machine has been operated for 400 hours, hydraulic oil box should be washed completed; remove oil discharge screw plug, discharge all hydraulic oil, and replace screw plug; take out filter net, wash and put it to original place, fill hydraulic oil in half box, then discharge oil again. Wash the filter net, and put to original place, fit on screw plug, and fill the hydraulic pressure oil to full box. Air filter and its filtering core should be often checked.

    5. Hydraulic pressure oil of the whole machine should be replaced after 800 hour-operation; the replacement should be done under heat state; and before discharging, operation device should be laid on ground, and the engine should be shut down. After discharging, carefully check. Intake and return oil filter, filtering core of air filter, pipeline and interfaces.

    a. Check if the fixed screw plug is getting loosened.

    b. Check if the belt of diesel machine fan is in correct tightening.

    c. In hot climate, the environmental temperature is much too high, so operation time should be regulated (it is highly recommended operation be done during morning or night time) or shorten the time of continuous operation.

    6. When the machine has been stopped operation for a long time, nitrogen in hydraulic pressure hammer should be completely discharged, and oil port is firmly prohibited to be exposed. Keep complete machine clean, and cover it with plastic cover. When it has been stayed idle for 6 months, operate machine parts for 15 minutes without load, and at the same time, fill lubrication to related parts.

    7. Battery use

    This pile driver utilizes high quality battery, it should be paid attention to the positive and negative connection in case of short circuit and burn out the battery. The battery should be charged once every month if out of use for long period. When in use please don't connect it randomly to avoid the battery discharge.

  4. Online Message

Other products in the same seriesMore

  • HX26D/36D Guardrail Pile Driver

    Advantages of HXING Pile Driver Machines:Vehicle weight around 2.3tons, heaviest in the industrialSuper quality full aluminum coolerWith high efficiencyGB standard materialsLow fuelLow transportation c…

    Learn More
Call me!Miss he