Email:admin@hxjinqiao.com / kylin@hxjinqiao.com
Tel:+86-516-66671368 / Fax:+86-516-82631786
Idioma : españolKelly Bar for Bauer piling rig
why choose us?
Xuzhou Hengxing Jinqiao Machinery Technology Co., Ltd is a leader in design,manufacturing and selling of Kelly bar for construction rotary drilling rigs in China & Overseas. Our kelly bars are designed by professional technicians and engineers with many years experience. Our Kelly bar is well known for it’s high strength, special and reasonable design, less maintenance and high durability kelly bar.
We can also supply our worldwide customers with Kelly bars that are ideally tailored to your needs with the highest quality and competitive price. We are confident we would be a vital business partner to your construction drilling needs.
Specs of Bauer Type Kelly Bar
BAUER Rig Model |
Original Bauer Kelly Bar Model |
No. of Elememts |
Outer Pipe Length(m) |
Drilling Depth(m) |
BG 12 |
BK12 |
3/4 |
9/10 |
22/34 |
BG15 |
BK15 |
3/4 |
12/13 |
31/46 |
BG18 |
BK200 |
3/4 |
12/14 |
31/50 |
BG20 |
BK200 |
3/4 |
12/14 |
31/50 |
BG24 |
BK250 |
4 |
15 |
54 |
BK260 |
3 |
12 |
31 |
|
BG26 |
BK260 |
3 |
12 |
31 |
BG28 |
BK280 |
4 |
18 |
66 |
BK300 |
3 |
13 |
34 |
|
BG30 |
BK300 |
3 |
13 |
34 |
BG36 |
BK420 |
3/4 |
15/17 |
40/62 |
BG38 |
BK420 |
3/4 |
15/17 |
40/62 |
BG39 |
BK420 |
3/4 |
15/17 |
40/62 |
BG40 |
BK420 |
3/4 |
15/17 |
40/62 |
BG42 |
BK420 |
3/4 |
15/17 |
40/62 |
BG46 |
BK500 |
3/4 |
20/22 |
55/82 |
BG50 |
BK500 |
3/4 |
20/22 |
55/82 |
We also provide you customized service, for more information, please contact directly.
Kelly Bar Classification and Structure
Interlocking kelly bar
Interlocking kelly bar systems are designed for drilling hard materials, as well as when a crowd force application is needed. Each section of kelly bars is made of seamless steel tube and the inner and outer key strips welded on it.
The distribution of outer key strips are divided into two types- one type with 3 key strips on kelly bar surface, the other type with 6 key strips, in the middle of outer key strips there are two or three pressuring
plates. When the inner drive shell are rotated to the pressuring plates of outer driver keys, the pressure produced by the cylinders is directly transferred to the drilling tool.
The purpose is to interlock each telescopic element to an inner following element in order to apply maximum torque and crowd force developed by the base rig. Due to this, the rotary table’s inner drive is equipped with locking pockets.
When extracting the locking bar from the hole, a combination of lifting and rotating counterclockwise allows the telescopic element to unlock.
Locking bars typically come with 3, 4 and telescopic element to unlock.
Drive shell steel quality: German imported steel palate
Drive stub steel quality: Special forged steel
Drive stub dimensions: 200*200, 150*150 or customized.
Outer pipe available diameter: 305, 343, 368, 419, 470,559
Upper shock absorbed system:Damping rubber ring
Lower shock absorbed system: Damping rubber ring and damping spring.
Number of telescopic elements: 3, 4, 5 and other on request.
Friction Kelly bar
The telescopic elements are advanced using a ‘friction contact ’ from each of the friction drive shell that run down the outside of each kelly bar.These drive shell are driven by rotary table and terminal joints of each successively larger diameter kelly bar.
The terminal joint is a long piece on the inside and bottom of each kelly bars.
Frictional kelly bars typically are available with 4, 5 or 6 telescopic elements. They are primarily used for deep piles in the medium hard soil conditions.
Drive shell steel quality: German imported steel palate
Drive stub steel quality: Special forged steel
Drive stub dimensions: 200*200, 150*150 or customized.
Outer pipe available diameter: 305, 343, 368, 419, 470,559
Upper shock absorbed system:Damping rubber ring
Lower shock absorbed system: Damping rubber ring and damping spring.
Number of telescopic elements: 4, 5, 6, other on request.
Advantages
Accessories
Exhibitions
Disassembly and installation of kelly bar
Kelly Bar Disassembly (take 4 sections Kelly bar as an example)
1) Remove the bolt NO. 1 shows on the picture, and take apart the drill pipe casing and a guide frame.
2) Remove the pin shaft No.2 shows on picture and the rotary joint.
3) Remove the bolt No.3 shows on picture, and take apart the two baffles and notched ring. Along the kelly bar downward, pull out of the innermost section (the fourth section).
4) Along the Kelly bar upward, and pull out of the third section.
5) Along the upward side of Kelly bar, pull out of the second section.
6) Finishing.
Kelly Bar Installation
1) Insert the second section from the top of the first section. (The outer key of second section must match the inner alveolar of the first section). Fully loaded, with a pin lock the first and second section in the drain pallet hole, in order to prevent pulling out of the second section when install the third section.
2) Third drill pipe into the drill pipe from the top of second section. Fully loaded, pin the first, second and third section at the pallet hole, so that to prevent drilling out the second and third section when install the fourth section.
3) Install the fourth section from the bottom of third section, don't forget the spring and drain pallet, and the pallet gap side must be turned up.
4) Mount above No.3 shows on the picture. They are the baffle plate and bolt. Pay attention to the direction and the front baffle (with mark).
5) Mount above No. 2 shows the pin and the rope connector
6) Mount the bolt No.1 shows on picture above, and connect the casing and guide frame.
Finished the installation.
Maintenance of kelly bar
According to below chart to maintain the Kelly bar and combine the type, working time, working conditions.
A、Frictional type Unit:Working hour
|
Working condition |
|||
Good(soft layer) |
Ordinary(sand gravel layer) |
Bad(pebble bed) |
||
Time interval |
First time use |
100 |
80 | 50 |
Normal use |
500 | 300 | 200 |
B、Interlocking type Unit:Working hour
|
Working condition |
|||
Good(soft layer) |
Ordinary(sand gravel layer) |
Bad(pebble bed) |
||
Time interval |
First time use |
80 | 60 | 40 |
Normal use |
300 | 200 | 150 |
In the usage process, if you find the following phenomenon, the kelly bar should be timely drilled down, and open to get inspection and maintenance.
No |
Damage |
Maintenance and repair method |
1 |
The main body of the steel tube deformation |
Cut off the deformation of pipe body,and replace new steel pipe(not less than 2m) |
2 |
Internal and external key wear |
Repair welding or replacement of inner key |
3 |
Internal and external key curling |
The curling edge grinding |
4 |
Pressure plate wear |
Repair welding or replacement of pressure plate |
5 |
The inner key cracking |
Adjust the shape and repair welding or replacement of inner key |
6 |
The inner key face wear |
Repair welding or replacement of worn parts |
7 |
Lifting lug deformation or cracking |
Replacement |
8 |
Rubber damper damage |
Replacement |
9 |
The upper flange deformation or crack |
Replacement or repair welding |
10 |
Damping spring fracture |
Replacement |
11 |
Coupling deformation or fracture |
Replacement |
12 |
Drive stub wear badly or broken |
Replacement |
For more information please contact us directly.
BAUER Piling Rig Kelly BarWhy Choose Our Kelly BarDurable Drive StubSpecial Design of the Connection of Drive Stub1.Weld the core shaft and drive stub together.2.Insert the core shaft already welded to…